final effect |
Master is studying the trend of wire very seriously!
Preparatory stage, the end of 3/11, 3/12 officially started, community property management is tight, double weekend basically can not start, it seems that the duration of the project is long ah.
The renovation team leader is still very good, these two days are worrying about the strong and weak electric wiring, our uneven ground is more difficult to deal with.
There are many tubes on the floor in the hall (blue weak tube, red strong tube)
After the completion of hydropower acceptance, the stage of mud and wood has been started without stopping. Yesterday, I went to see it. The progress is quite fast and the ceiling is ready.
Living room ceiling, the master is smart, quick and happy!
Today, I ran to a construction site. The basement membrane for wall paper in the hall has been brushed, and my hands feel a little rough.
Half-finished kitchen photos
After two hard struggles, Master Liu finally finished the work. It is estimated that the general installer can finish the work in one day. It took him two days to finish the work. After loading, the door gap is even and the opening and closing are flexible.
A corner photo of the balcony
没有评论:
发表评论