final effect |
A design chart
Near noon, the designer was called to work, and once again we talked about the parts we wanted to modify and improve... I think the inner worker has collapsed. This is the dozens of times that we have talked about details. When we meet such a tangled and serious child, we can only ask for forgiveness. For the sake of our family, we have abandoned sympathy.
Between the old and new walls of the bathroom, we need to use mesh cloth to connect. The masonry said that we should add putty before batching putty in the back.
The kitchen slots.
Strong electric box, dense wire, everybody look at the specifications?
3. Main bedroom, secondary bedroom and study
Normative power box and the connected products are indicated.
Beautiful view of the main sleeping window, installation by Master Zhu, masonry worker. There are a few cracks in the middle of the stone, which are almost perfect around. The rest of the worker can do a good job of finished product protection.
Painter Master Lu is working
Op installation of the master's details are very attention, the Yang Angle is connected; in addition, each seam is carefully sealed with sealant, after the completion of the ceiling is redundant, but also stay in my home for future replacement. Because the water pipes of the developer are too low, the main guard can not install the bathroom hegemony; the new fans sent by the developer are used as exhaust fans, but they happen to be the bathroom hegemony, so the new fans can only be moved down, but the main guard can only wait for Hu Rong to change the height of the water pipes for me, otherwise it can not be installed! The installation is supervised by my husband personally, and the installation master of Op ceiling is very praised, indicating that the whole can reach at least 90 points!
The living room, before they had time to take pictures, they were busy doing protection. Teachers were really anxious.~
Living room lamp, everyone said that the main lamp is too simple, I think so. But apart from learning some art, it's very beautiful to say it's simple. He convinced me.
After the installation of wooden doors, I went directly to the peninsula after work tonight. The master installed and unlocked the wooden doors. The kick lines on both sides of the doorframe were checked and installed one by one. Husband check one by one: 1. The door can stop freely from any angle. 2. There is no abnormal sound on the door. 3. The lock is in normal use. The master bedroom lock is found unable to close the second lock. The master can repair it simply and normally.
After the installation of the counter, due to the wrong size of the upper cabinet of the gas meter, it needs to be re-processed, and the sealing plate and water retaining platform are subsequently installed.
Shiwei Wrigley Shower, I feel that the 900 Wrigley is much better than the 2000 toto.
Another panorama of the living room, hey hey! Every shot looks so good.
The Abstract mural of the master bedroom. Very Nordic wind and wood! I can't help but be very excited, because the house is so beautiful, praise me!
After nearly four months of busy decoration career, the cottage finally graduated! Not to mention the effect or the effort, the enthusiasm for the new house is enough to carry our happiness. Every crowded weekend, with the help of neighbors and renovation companies, the first suite was perfectly decorated. Although I only like Italian and American style, but at the last moment, I still obeyed my husband's direction. After seeing the makeup of the new house, I still have to give him a compliment for his little freshness!